All citations for Rosewood Post Acute
State inspectors check nursing homes that take Medicare or Medicaid against federal rules, usually about once a year, and also look into complaints. Each rule a home did not meet is a citation.
Last standard health inspection on record
May 15, 2026
Showing 1 to 19 of 19 citations
No harm, with potential for more than minimal harm
Have properly installed hallway dispensers for alcohol-based hand rub.
The home gave a date the problem would be corrected (June 15, 2026).
No harm, with potential for more than minimal harm
Have generator or other power source capable of supplying service within 10 seconds.
The home gave a date the problem would be corrected (June 8, 2026).
No harm, with potential for more than minimal harm
Have generator or other power source capable of supplying service within 10 seconds.
The home gave a date the problem would be corrected (March 14, 2025).
No harm, with potential for more than minimal harm
Inspect, test, and maintain automatic sprinkler systems.
The home gave a date the problem would be corrected (March 14, 2025).
No harm, with potential for more than minimal harm
Install corridor and hallway doors that block smoke.
The home gave a date the problem would be corrected (March 14, 2025).
No harm, with potential for more than minimal harm
Ensure proper usage of power strips and extension cords.
The home gave a date the problem would be corrected (March 14, 2025).
No harm, with potential for more than minimal harm
Establish staff and initial training requirements.
The home gave a date the problem would be corrected (October 16, 2023).
No harm, with potential for more than minimal harm
Have approved installation, maintenance and testing program for fire alarm systems.
The home gave a date the problem would be corrected (October 16, 2023).
No harm, with potential for more than minimal harm
Install corridor and hallway doors that block smoke.
The home gave a date the problem would be corrected (October 16, 2023).
No harm, with potential for more than minimal harm
Ensure proper usage of power strips and extension cords.
The home gave a date the problem would be corrected (October 16, 2023).
No harm, with potential for more than minimal harm
Install corridor and hallway doors that block smoke.
The home gave a date the problem would be corrected (June 15, 2026).
No harm, with potential for more than minimal harm
Ensure proper usage of power strips and extension cords.
The home gave a date the problem would be corrected (June 15, 2026).
No harm, with potential for more than minimal harm
Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.
The home gave a date the problem would be corrected (March 14, 2025).
No harm, with potential for more than minimal harm
Ensure smoke barriers are constructed to a 1 hour fire resistance rating.
The home gave a date the problem would be corrected (March 14, 2025).
No harm, with potential for more than minimal harm
Inspect, test, and maintain automatic sprinkler systems.
The home gave a date the problem would be corrected (October 16, 2023).
No harm, with potential for more than minimal harm
Ensure smoke barriers are constructed to a 1 hour fire resistance rating.
The home gave a date the problem would be corrected (October 16, 2023).
No harm, with potential for more than minimal harm
Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed.
The home gave a date the problem would be corrected (October 16, 2023).
No harm, with potential for minimal harm
Conduct testing and exercise requirements.
The home gave a date the problem would be corrected (March 14, 2025).
No harm, with potential for minimal harm
Have simulated fire drills held at unexpected times.
The home gave a date the problem would be corrected (March 14, 2025).
Source: CMS Provider Information, Fire Safety Deficiencies, Health Deficiencies, Citation Code Look-up, data as of September 30, 2026. Inspection results describe the home at the time of each inspection.