All citations for Serenity Spring Senior Living at Arlington
State inspectors check nursing homes that take Medicare or Medicaid against federal rules, usually about once a year, and also look into complaints. Each rule a home did not meet is a citation.
Last standard health inspection on record
July 9, 2026
Showing 1 to 20 of 20 citations
No harm, with potential for more than minimal harm
Have an alternate power supply for its alarm system.
The home gave a date the problem would be corrected (August 18, 2026).
No harm, with potential for more than minimal harm
Inspect, test, and maintain automatic sprinkler systems.
The home gave a date the problem would be corrected (August 18, 2026).
No harm, with potential for more than minimal harm
Install smoke barrier doors that can resist smoke for at least 20 minutes.
The home gave a date the problem would be corrected (August 18, 2026).
No harm, with potential for more than minimal harm
Have simulated fire drills held at unexpected times.
The home gave a date the problem would be corrected (August 19, 2026).
No harm, with potential for more than minimal harm
Have approved installation, maintenance and testing program for fire alarm systems.
The home gave a date the problem would be corrected (May 22, 2024).
No harm, with potential for more than minimal harm
Follow proper procedures when the fire alarm was out of service for more than 4 hours.
The home gave a date the problem would be corrected (May 22, 2024).
No harm, with potential for more than minimal harm
Have simulated fire drills held at unexpected times.
The home gave a date the problem would be corrected (May 22, 2024).
No harm, with potential for more than minimal harm
Have generator or other power source capable of supplying service within 10 seconds.
The home gave a date the problem would be corrected (May 22, 2024).
No harm, with potential for more than minimal harm
Have approved installation, maintenance and testing program for fire alarm systems.
The home gave a date the problem would be corrected (August 8, 2023).
No harm, with potential for more than minimal harm
Inspect, test, and maintain automatic sprinkler systems.
The home gave a date the problem would be corrected (August 8, 2023).
No harm, with potential for more than minimal harm
Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing.
The home gave a date the problem would be corrected (August 8, 2023).
No harm, with potential for more than minimal harm
Have generator or other power source capable of supplying service within 10 seconds.
The home gave a date the problem would be corrected (August 8, 2023).
No harm, with potential for more than minimal harm
Provide a written emergency evacuation plan.
The home gave a date the problem would be corrected (August 18, 2026).
No harm, with potential for more than minimal harm
Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed.
The home gave a date the problem would be corrected (August 18, 2026).
No harm, with potential for more than minimal harm
Use approved construction type or materials.
The home gave a date the problem would be corrected (May 22, 2024).
No harm, with potential for more than minimal harm
Inspect, test, and maintain automatic sprinkler systems.
The home gave a date the problem would be corrected (May 22, 2024).
No harm, with potential for more than minimal harm
Install corridor and hallway doors that block smoke.
The home gave a date the problem would be corrected (August 8, 2023).
No harm, with potential for more than minimal harm
Ensure smoke barriers are constructed to a 1 hour fire resistance rating.
The home gave a date the problem would be corrected (August 8, 2023).
No harm, with potential for minimal harm
Develop and maintain an Emergency Preparedness Program (EP).
The home gave a date the problem would be corrected (May 22, 2024).
No harm, with potential for minimal harm
Address subsistence needs for staff and patients.
The home gave a date the problem would be corrected (May 22, 2024).